Dashboard
The Dashboard at / is the default page after sign-in. It combines completed-print reporting with a working list of active drafts.

Reporting period
Choose Last 30 days, Last 90 days, or All time. The selected period affects completed-print count, duration, total cost, the cost-over-time chart, and the category chart. Active drafts and the unfinished-print table remain current operational data rather than historical reporting.
Prints assigned to a customer marked Exclude from dashboard are omitted from all dashboard KPIs, charts, and the unfinished-print table. Prints without a customer remain included.
KPI cards
- Active drafts opens the Prints page filtered to Draft.
- Completed prints opens the Prints page filtered to Done.
- Total duration sums completed-print duration in the selected period.
- Total calculated cost sums immutable completed-print totals in the selected period.
Charts
Print cost over time plots completed totals by date. Cost by category divides completed costs into printer, components, filament, and electricity. Hover a chart segment or point for the formatted value. Equivalent text is provided for assistive technology.
Unfinished prints
The table lists every non-Done print with its name, optional customer, printer, workflow status, last update, duration, and current total. Select a name to view or continue editing it. New print opens the same guided dialog available on the Prints page.

Outcome metrics show success rate, failed-print costs, actual-minus-planned variance, and pending completed prints. Only recorded outcomes enter the success-rate denominator. Costs include failed runs' real consumption; pending outcomes do not imply success or zero actual cost. All metrics use the selected completion period and exclude archived prints.
Realized revenue and margin include only successful, non-archived prints with explicit sales values, using the same completion period as the other metrics. Pending, failed, and unpriced records do not inflate these totals. Failed consumption remains visible separately as waste cost. Negative realized margin means the recorded successful sales value was below actual cost.